Installed the beauty rings on the wheels,. Got the floor mat and insulation cut to fit. Picked up replacement fender for passenger side
Sunday, January 23, 2011
Saturday, January 22, 2011
Finally got the rear window in...quite a bit harder than the windshield. Installed the replacement transmission cover, third brake light, new glove box, replacement drivers door, beauty rings on the wheels, sound deadener in the cab, defrost hoses, cowl drain hose, replacement radiator, and started cutting floor mat and padding.
Monday, January 17, 2011
Thursday, January 13, 2011
Engine started over-heating. Took radiator out and flushed...found deposits from sitting so long. Combined with new water pump she runs about 160 now. Replaced broken needle on speedo. Took for a second test drive. Looking good! Prepping for move to a 24/7 heated garage to install glass. Former parking lights are now repainted and to be used as turn signals. All sheet metal re-bolted on. Re-built and installed interior light, which just about completes wiring.
Monday, January 10, 2011
Latest progress
Got the wood bed floor done, oak wood, stained and epoxy sealed, SS strips and bolts, taillights and wiring done
Subscribe to:
Posts (Atom)







