Monday, January 30, 2012

After installing a quick and dirty exhaust system to get the truck back on the road, ponied up and had a professional install a nice throaty system. Tucked up nice and tight, clearance for everything underneath and sounds great. It is really a pleasure to drive. Next up, a new wiring harness with fuse panel to replace my feeble attempt to wire it from scratch. Still working out bugs in the pcv system that replaced the road draft tube. Builder may have left out a critical component under the manifold that keeps oil out of the pcv hose. May have to tear down topside and re-install the piece (oil vapor cannister). Engine idles and throttles nicely with the T5. Have  a show to do with the Metzendorf  camper and truck in a week or so in Indy.

Wednesday, January 18, 2012

Quadrajet ran poorly. Switched back to a different Holley 600 carb and runs great.

Thursday, January 12, 2012

Got the adapter for the Quadrajet carb today to see if that carb makes a difference in how it runs.

Friday, January 6, 2012

Finally...got the truck back on the road. Several issues took alot longer than I expected. New brakes are working quite well. Engine runs really strong, still have some small issues with carb. Suspension is real nice ride.

Wednesday, December 28, 2011

Got the new master cylinder in with extended push rod

After several issues with the new brakes and clutch problems, doghouse is finally back on.

Tuesday, November 29, 2011

Got the front end welded, firewall painted, and the engine and trans set in. Still have lots of small issues....trans mount, steering hook-up, elect fuel pump, etc.

Wednesday, November 23, 2011

Engine and straight axle are gone. New suspension is in and back on the ground. Now to weld in the new engine mounts.